Current Position:HomeDesign DemoArchitecture Technology  
 
  Office Building of Beijing Municipal Engineering Management Commission  
 
Font:[Large Medium Small] [Print]
 
 

The Project covers gross floor area of 10,882.18㎡. It was completed in 1984 and 1993, respectively.
Diagnosis and renovation of heat works for the enclosing structure of the building;
Diagnosis and renovation of energy conservation in cool source and water source of A/C
Diagnosis and renovation of energy conservation of hot water circulation system;
Diagnosis and renovation of energy conservation of A/C terminal;
Diagnosis and renovation of lighting system;
Diagnosis and renovation of power supply and distribution system.
It is expected that standard coal is saved by about 16,380 kg, emission of carbon dioxide is reduced by about 7,207 kg, emission of sulfur dioxide reduced by about 328kg, emission of smoke dust reduced by about 246 kg and discharge of dust slag reduced by about 4,259 kg per annum.

 
 
Time:2007/2/5  Read for:3119 times 【close window】
 
 
[Continued]Photos Time:2008/1/15