Current Position:HomeDesign DemoArchitecture Technology  
 
  New office building of Beigjing Municipal People's Procuratorate  
 
Font:[Large Medium Small] [Print]
 
 
Awards of the Project:
 
10th Capital Project Design Exhibition Schemes Award (Public Building) (Best Work)
 
10th Capital Project Design Exhibition Schemes Award (Public Building) (Top 10 Schemes Award)
 
 

Major Designers:
Major designers: conceptual phase: Cao Xiaoxin, Xiao Xiaoli, Zhou Xuliang, Li Zhuo
Preliminary design& construction document phase: Cao Xiaoxin, Zhu Hedi, Xiao Xiaoli, Cao Ying, Zhan Hong

Project site: north-western corner of Jianguomen overpass
Time of completion: 2005.12 (main building completed)
Total building area: 57,700 ㎡.
Building height: 59m
Number of floors: 12
Volumetric rate: 3.47
Greening ratio: 30.02%

New office building of Beijing Municipal People's Procuratorate was put into operation on May 15, 2006.

New office building of Beijing Municipal People's Procuratorate is a large-sized public project for which China Architecture Design& Research Group won the bidding for the first time after restructuring. It has an asymmetrical layout depending upon the environmental and planning conditions, marking a breakthrough for traditional symmetrical layout of state agencies’ office buildings. The external building materials adopt as-cast concrete hanging boards, U-shaped glass and aluminium alloy curtain walls. In response to the design intention of architect, the interior and exterior space have simplified, transparent, clear and definite cultural characteristics.

 
 
Time:2008/2/4  Read for:3441 times 【close window】
 
 
[Continued]Perspective view Ⅰ Time:2008/2/4
 
 

 
 
[Continued]Perspective view Ⅱ Time:2008/2/4
 
 

 
 
[Continued]Perspective view Ⅲ Time:2008/2/4
 
 

 
 
[Continued]Perspective view Ⅳ Time:2008/2/4